Category: As Built Design/Drafting Support

Multi-sectorial Infrastructure Consultants

Carmichael Rail North Goonyella Branch Line (NGBL) Project

Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: October 2012 – January 2013 October 2012 – April 2013Project Details: A dual gauge branch line connecting the Carmichael Rail Line directly to a junction on Aurizon’s Goonyella Rail System was proposed to provide a direct route to the port.Route Length: 65 KmGauge: Dual Gauge (Standard + Narrow)Design Traffic: 100 MPTALoading…
Read more

D & C Prebid services – Carmichael Mine Access Road

Location: Queensland, AustraliaClient: NRW, AustraliaDuration: April 2013Project Details: Design and preparation of BOQ for Water infrastructure for construction including a new dam and pipeline for water conveyance, Pavement for the proposed airport and corresponding facilities, Landfill.

North Galilee Basin Rail (NGBR) Project

Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: October – November 2014Project Details: Coal Terminal is being developed to provide an independent connectivity between Mine to Port.Route Length: 382.4 kmDesign Traffic: 100 MTPALoading Standard: 32.5 TPassing Loops: 9 nosDesign Speed: 80 km/h for loaded trains; 100 km/h unloaded trains.

North Galilee Basin Rail (NGBR) Project

Location: Queensland, AustraliaClient: POSCO E&CDuration: June 2014 – December 2014Project Details: An optimization study was carried out to determine the potential benefit for the project and a list of value engineering items was developed and discipline-based FEED level redesign of elements identified through value engineering was undertaken.

Design Of Kings & German Timber Bridge Replacement

Location: Queensland, AustraliaClient: Fulton HoganDuration: January 2016 – June 2016Project Details: Design and construction of 2 QR timber bridge replacement of Kings Bridge (72m long) and German Bridge (15m long).

Owner’s Engineer Support

Location: Queensland, AustraliaClient: Adani Mining Pty LtdDuration: December 2019 – February 2020Project Details: Design review (including Civil, H&H, Alignment, Drainage Geotech, Bridges, Culverts) of DCP3 deliverables for 200 km Rail Line.

Quantity Estimation/Material Take Off-Pacific Motorway(M1)Upgrade- Varsity to Burleigh

Location: Queensland, AustraliaClient: Seymour Whyte Constructions Pty LtdDuration: January 2020Project Details: Material Take off/Quantity estimation.