Category: Transport Infrastructure

Multi-sectorial Infrastructure Consultants

Carmichael Rail Line (CRL)

Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: August 2011 – February 2012, June 2012 – February 2013Project Details: A green field heavy haul rail line is proposed between carmichaelcaol mine located in central queensland to aurizon’s (QR national) existing rail system through moranbah in queensland.

Carmichael Rail North Goonyella Branch Line (NGBL) Project

Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: October 2012 – January 2013 October 2012 – April 2013Project Details: A dual gauge branch line connecting the Carmichael Rail Line directly to a junction on Aurizon’s Goonyella Rail System was proposed to provide a direct route to the port.Route Length: 65 KmGauge: Dual Gauge (Standard + Narrow)Design Traffic: 100 MPTALoading…
Read more

North Galilee Basin Rail (NGBR) Project

Location: Queensland, AustraliaClient: POSCO E&CDuration: June 2014 – December 2014Project Details: An optimization study was carried out to determine the potential benefit for the project and a list of value engineering items was developed and discipline-based FEED level redesign of elements identified through value engineering was undertaken.

Carmichael Mine Access Road Upgrade Project

Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: October – November 2014Project Details: Adani Mining is proposing to develop thermal coal mine in North Galilee Basin, Central Queensland. For the effective operation of mine, suitable road link to the major regional centres of Townsville, Mackay and Rockhampton must be established. This project consists of design of 90 km long…
Read more

Design Of Kings & German Timber Bridge Replacement

Location: Queensland, AustraliaClient: Fulton HoganDuration: January 2016 – June 2016Project Details: Design and construction of 2 QR timber bridge replacement of Kings Bridge (72m long) and German Bridge (15m long).

Detailed Design Carmichael Rail Project

Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: April 2017 – May 2018Project Details: Hydrology & Hydraulic design, Drainage and Crossings design for 382km long heavy haul rail line.

Secondment of Civil Engineer & Signalling Engineers to support Detailed Design assignments

Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: September 2019 – March 2020Project Details: Design support for client to undertake Detailed Design Review in the field of Civil and Signalling.

Owner’s Engineer Support

Location: Queensland, AustraliaClient: Adani Mining Pty LtdDuration: December 2019 – February 2020Project Details: Design review (including Civil, H&H, Alignment, Drainage Geotech, Bridges, Culverts) of DCP3 deliverables for 200 km Rail Line.

Quantity Estimation/Material Take Off-Pacific Motorway(M1)Upgrade- Varsity to Burleigh

Location: Queensland, AustraliaClient: Seymour Whyte Constructions Pty LtdDuration: January 2020Project Details: Material Take off/Quantity estimation.

Detailed design- Carmichael Rail Project (200 km Rail line)

Location: Queensland, AustraliaClient: Adani Mining Pty LtdDuration: February 2020 – September 2020Project Details: Detailed Design work including Civil, H&H, Alignment, Drainage, Geotech, Bridges, Culverts for 200 km of rail line.