Multi-sectorial Infrastructure Consultants

Design Of Kings & German Timber Bridge Replacement

Location: Queensland, AustraliaClient: Fulton HoganDuration: January 2016 – June 2016Project Details: Design and construction of 2 QR timber bridge replacement of Kings Bridge (72m long) and German Bridge (15m long).

Carmichael Rail Design (CRD) Project

Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: May 2015 – June 2018Project Details: The dedicated green field rail line to connect Carmichael Mine with Abbot Point Coal Terminal was developed to provide an independent connectivity between Mine to Port. The assignment includes Detail Design of Carminchael Rail Line.

Detailed Design Carmichael Rail Project

Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: April 2017 – May 2018Project Details: Hydrology & Hydraulic design, Drainage and Crossings design for 382km long heavy haul rail line.

Provisioning Yard – Feasibility Study

Location: Queensland, AustraliaClient: North West Rail Pty LtdDuration: September 2019 – December 2019Project Details: Feasibility design of Provisioning Yard – MCA analysis, Option Selection & Feasibility design based on Hydraulic design, Rail Alignment, Operations etc., Material Take off.

Secondment of Civil Engineer & Signalling Engineers to support Detailed Design assignments

Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: September 2019 – March 2020Project Details: Design support for client to undertake Detailed Design Review in the field of Civil and Signalling.

Owner’s Engineer Support

Location: Queensland, AustraliaClient: Adani Mining Pty LtdDuration: December 2019 – February 2020Project Details: Design review (including Civil, H&H, Alignment, Drainage Geotech, Bridges, Culverts) of DCP3 deliverables for 200 km Rail Line.

Quantity Estimation/Material Take Off-Pacific Motorway(M1)Upgrade- Varsity to Burleigh

Location: Queensland, AustraliaClient: Seymour Whyte Constructions Pty LtdDuration: January 2020Project Details: Material Take off/Quantity estimation.

Detailed design- Carmichael Rail Project (200 km Rail line)

Location: Queensland, AustraliaClient: Adani Mining Pty LtdDuration: February 2020 – September 2020Project Details: Detailed Design work including Civil, H&H, Alignment, Drainage, Geotech, Bridges, Culverts for 200 km of rail line.

Detailed design- Rail Maintenance Yard

Location: Queensland, AustraliaClient: Bowen Rail Pty LtdDuration: February 2020 – presentProject Details: Material Take off/Quantity Estimation.

TPN Connection-Detailed design

Location: Queensland, AustraliaClient: Bowen Rail Pty LtdDuration: April 2020 – presentProject Details: Detailed Design work – TPN connection.