Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: August 2011 – February 2012, June 2012 – February 2013Project Details: A green field heavy haul rail line is proposed between carmichaelcaol mine located in central queensland to aurizon’s (QR national) existing rail system through moranbah in queensland.
Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: October 2012 – January 2013 October 2012 – April 2013Project Details: A dual gauge branch line connecting the Carmichael Rail Line directly to a junction on Aurizon’s Goonyella Rail System was proposed to provide a direct route to the port.Route Length: 65 KmGauge: Dual Gauge (Standard + Narrow)Design Traffic: 100 MPTALoading…
Read more
Location: Queensland, AustraliaClient: NRW, AustraliaDuration: April 2013Project Details: Design and preparation of BOQ for Water infrastructure for construction including a new dam and pipeline for water conveyance, Pavement for the proposed airport and corresponding facilities, Landfill.
Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: May 2013 – September 2013Project Details: A dedicated green field rail line to connect Carmichael Mine with Abbot Point Coal Terminal is being developed to provide an independent connectivity between Mine to Port. It is a bi-directional single line railway with passing loops provided at strategic intervals. Standard Gauge line with…
Read more
Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: October – November 2014Project Details: Coal Terminal is being developed to provide an independent connectivity between Mine to Port.Route Length: 382.4 kmDesign Traffic: 100 MTPALoading Standard: 32.5 TPassing Loops: 9 nosDesign Speed: 80 km/h for loaded trains; 100 km/h unloaded trains.
Location: Queensland, AustraliaClient: POSCO E&CDuration: June 2014 – December 2014Project Details: An optimization study was carried out to determine the potential benefit for the project and a list of value engineering items was developed and discipline-based FEED level redesign of elements identified through value engineering was undertaken.
Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: October – November 2014Project Details: Adani Mining is proposing to develop thermal coal mine in North Galilee Basin, Central Queensland. For the effective operation of mine, suitable road link to the major regional centres of Townsville, Mackay and Rockhampton must be established. This project consists of design of 90 km long…
Read more
Location: Queensland, AustraliaClient: NRW, AustraliaDuration: December 2014Project Details: Design and preparation of BOQ for Road Alignment, Pavement Design, Hardstands, Catchment delineation and 1D modeling of all culverts along the road, Construction of water pond.
Location: Queensland, AustraliaClient: Adani Mining Pty Ltd, AustraliaDuration: December 2015 – January 2016Project Details: Assess the alternate connection location with Aurizon and recommend the best option from considerations.